The Municipal Building renovations include 3 areas.
|
|
|
Sherbune Hall
View from back of hall facing stage. |
|
|
|
Sherburne Hall
View from back of Hall. The room is setup for public meetings. |
|
|
|
Sherbune Hall
Unfishished kitchen area of former Sherburne School. |
|
|
|
Sherburne Hall
Unfinished kitchen area of former Sherburne School. |
|
|
|
|
Sherbune Hall
View of speaker system and monitor TV. |
|
|
|
6 Unfinished Classroom Area
Hallway view just beyond the Planning Department at the Municipal Building. This view is facing the Fire Department beyond the glass doors at the end of the hallway. |
|
|
|
6 Unfinished Classroom Area
Class room 1 - proposed conference room |
|
|
|
6 Unfinished Classroom Area
Classroom 2 - proposed new Park and Recreation office. The current office currently already spills into the expansion area for files and equipment. |
|
|
|
|
6 Unfinished Classroom Area
Classroom 3 - proposed new main meeting room for the Board of Selectmen, Planning Board, Board of Adjustment, and Conservation Commission. The brick wall in this picture would be removed to combinded with classroom 5 to form one large room. |
|
|
|
6 Unfinished Classroom Area
Classroom 4 - proposed new PTV broadcast studio room. A small glass window will be installed between classroom 4 and 6 to allow the PTV operators viewing access into the studio. The operators typically include a video technician, and audio technician, and a phone operator. |
|
|
|
6 Unfinished Classroom Area
Classroom 5 - proposed new main meeting room for the Board of Selectmen, Planning Board, Board of Adjustment, and Conservation Commission. The brick wall in this picture would be removed to combinded with classroom 3 to form one large room. |
|
|
|
6 Unfinished Classroom Area
Classroom 6 - proposed new PTV broadcast studio room. A small glass window will be installed between classroom 4 and 4 to allow the PTV operators viewing access into the studio. The operators typically include a video technician, and audio technician, and a phone operator. This room will also include the PTV head, playback decks and editing equipment. |
|
|
|
|
Proposed Floorplan
A rough draft of what the floor plan may look like. |
|
|
|
Unfinished Storage
Rear of Municipal Building |
|
|
|
Unfinished Storage
Park and Rec Storage Area |
|
|
|
Unfinished Storage
Park and Rec Storage Area |
|
|
|
|
Unfinished Storage
More Stuff |
|
|
|
Unfinished Storage
Door to be replaced with larger double door |
|
|
|
Unfinished Storage
|
|
|